Wall-mounted jib cranes are an excellent choice for auxiliary overhead cranes, used inside the workshop, which have the characteristics of space saving, cost saving, and program flexibility. In this article, the installation steps and applicable working conditions for wall-mounted jib cranes are explained, and we hope you have some references to choose a wall-mounted jib crane.

Installation steps of wall-mounted jib crane

Wall-mounted jib cranes are designed to be mounted on a wall or a structural steel column. The installation process of a wall-mounted jib crane typically involves the following steps:

Step 1: Prepare the Installation Site

Before installing a wall-mounted jib crane, it is important to ensure that the installation site is level and has enough space for the crane to rotate freely. The installation site should also be clear of any obstacles that could interfere with the crane’s operation.

Step 2: Install the Wall Bracket

The first step in installing a wall-mounted jib crane is to install the wall bracket itself. The wall bracket should be mounted on a wall or a structural steel column that is strong enough to support the weight of the crane and the load it will be lifting. The bracket should also be perfectly vertical and aligned with the crane’s center of rotation.

Step 3: Mount the Jib Arm

Once the wall bracket is in place, the next step is to mount the jib arm on the bracket. The jib arm should be mounted at a height that allows it to clear any obstacles in the surrounding area. The mounting bolts should be tightened to the manufacturer’s specifications to ensure a secure connection.

Step 4: Install the Hoist and Trolley

The final step in installing a wall-mounted jib crane is to install the hoist and trolley. The hoist and trolley should be mounted on the jib arm and secured with bolts. The electrical wiring and controls should also be installed and tested before the crane is put into service.

Different wall-mounted cantilever crane installation methods

Column-mounted installation

In this method, the jib crane is mounted onto a free-standing column or post. This allows for greater flexibility in placement and can accommodate larger working areas.

Steel structure-mounted installation

For factories with large open spaces, a steel structure-mounted jib crane may be the best option. This method involves attaching the crane to a sturdy steel structure or frame, which provides a stable base while still allowing the crane to move freely.

Wall-mounted installation

This method involves mounting the jib crane directly onto a wall using heavy-duty bolts and brackets. The crane arm extends out perpendicular to the wall, allowing for easy access to loads along the length of the wall.

Zora Zhao

Expert in Overhead Crane/Gantry Crane/Jib Crane/Crane Parts Solutions

With 10+ years of experience in the Crane Overseas Export Industry, helped 10,000+ customers with their pre-sales questions and concerns, if you have any related needs, please feel free to contact me!

WhatsApp: +86 158 3611 5029
Email: zorazhao@dgcrane.com
Crane,hoist,installation,jib crane,overhead crane,wall mounted jib crane,wall mounted jib crane installation

Related Blogs